Perfectly Planned Laser Tracker Target Points

Perfectly Planned Laser Tracker Target Points

Perfectly Planned Laser Tracker Target Points

In the same way that the primary survey network established in 2010 on site provided a global coordinate system for civil engineering works and the positioning of the buildings, the ITER metrology team has now developed a vast matrix of reference ‘targets,’ or fixed points, inside the Tokamak …